One of the next step will be to incorporate and interpolate dip data obtained from dip meters. This data converted into time could be utilized as a new parameter in the velocity estimation problem. Finally, interpolation of well velocities will give us a velocity model. That can be correlated with the seismic velocity model. This way, we hope to have a more accurate velocity model for future analysis.